Job Photos - Magazine Articles |
|
|
This
is an article on Concrete Openings Magazine (Sep 2005). |
|
Ferry
Katama had 70 tons of concrete ballast needed to be removed. |
|
Marine
engineers calculated there were two areas measuring 12 feet by
13 feet by 3 feet deep of concrete ballast.
|
|
160
bags (40 boxes) of Crack Dexpan were used. Job is done by ConCut Southeast,
Inc. |
|
ConCut
operators cored 288 holes for Crack Dexpan. |
|